Emerson PMC-CGM Computer Hardware User Manual


 
2
PMC-CGM Installation and Use (6806800D53C)
25
Hardware Preparation and Installation
2.1 Overview
In this section, you can find information on the following topics:
z Things to observe before the installation
z Installation procedure
z Available accessories
2.2 Before Installation
This section provides the following information:
z Unpacking and inspecting the module
z Requirements
2.2.1 Unpacking and Inspecting the Module
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment:
Printed user manual
PMC-CGM module
Any optional items ordered
Damage of Circuits
Electrostatic discharge and incorrect module installation and removal can damage
circuits or shorten their life.
Before touching the module or electronic components, make sure that you are
working in an ESD-safe environment.