44 Operating Manual BX600 S3
Connecting External Devices Installing the Hardware
© cognitas. Gesellschft für Technik-Dokumentation mbH 2009 Pfad: H:\April\PRIMERGY_Rebranding\von Walter\bx600_s3_ba\BX600S3_en\blade-us.k04
Figure 11: Cable routing from the front to the back of the server (top view)
I Server blades with a PCI I/O controller should be fitted in the middle of
the basic unit (slots 5 and 6) to keep the cable bend radius as large as
possible.