Gateway 980 Server User Manual


 
62
Chapter 4: Installing Components
www.gateway.com
7 From inside the case, remove the power, SCSI, and manageability cables
from the backplane. The manageability cable connector is visible after
removing the SCSI and power cables.
8 Remove the hot-swap cage completely from the server.