Hardware Installation • • Chapter 2
7
Step 4: Power on the PC and enter DOS system.
Step 5: Execute IO-IRQ.EXE which is included in the DOS API-232 software
driver diskette, and follow the on-line help to configure the C360.
Be careful not to conflict the I/O address and IRQ of the C360 Control
Board with any existing board's.
Step 6: After completing the configuration, the board is ready for use under
DOS or SCO UNIX.
Step 7: Connect the C360 Control Board and Async Concentrator(s) with the
shipped 10BASE-2 cables. Do not forget to put Terminators in place.
Please refer to Appendix B.1 Ethernet Cabling for more details.
C360 SuperPort System with 10BASE-2 Cabling
If 10BASE-T cabling is desired, remember to select UTP interface for
Control Board via executing IO-IRQ.EXE under DOS. Connect
Control Board and Async Concentrator(s) to the Hub with 10BASE-T
cables. Please refer to Appendix B.1 Ethernet Cabling for more
details.
BNC
UTP
P1
P16
P8
Async
Async
Concentrator
Concentrator
S0 S 1 Tx RX
BNC
UTP
P1
P16
P8
Async
Async
Concentrator
Concentrator
S0 S 1 Tx RX