Patton electronic 3196RC Switch User Manual


 
T-DAC blades installation 26
Model 3196RC T-DAC User Manual 2 • Hardware installation
Note
The T-DAC should be installed as close as possible to the termination
jack provided by the Telco. The location should be well ventilated.
Do not block the rack chassis’ cooling vents.
2. Insert the rear blade into the desired slot in the rack chassis. Make sure the blade is seated properly in the
slot guides.
Figure 5. Alignment/ESD pin and card handle
3. Gently press the blade into the chassis until the alignment/ESD pin (see figure 5) engages the chassis.
When the blade is fully seated, the red buttons in the handles click up automatically, thus locking the han-
dle and activating the switch (closed position). The click of the button gives a visual and audible confirma-
tion that the board is fully seated.
4. Insert the front blade into the rack chassis slot that corresponds to the slot in which you installed the rear
blade. Verify that the buttons in both handles click up to indicate that the board is fully seated and locked
into place.
Card handle
Alignment/ESD pin