3Com 1005 Switch User Manual


 
DUA1840-0AAA01
Initializing the Switch 1005
3-27
Network loops may occur if you are not careful when configuring your
backplane connections. See
“Advice for Setting Backplane Connections and
Avoiding Loops”
on page 2-4
.
Ports which form part of a VLT will fail and you will not be able to manage
the Switch if your management station communicates via the VLT. To avoid
this:
a
Remove the VLT configuration from both ends of the VLT link before you
initialize the Switch. Note that the port furthest from your management
station should have its VLT configuration removed first.
b
Reconfigure the VLT once the initialization is complete.