Appendix A: System rack installation
146
• Bag of mounting hardware (bushings and screws)
You must also purchase the rack-mount rail kit for the Altos G900
server platform to complete the conversion from tower to a rack-
mount configuration.
a Rack bezel and keys (2)
b Rack handle kit - includes handles (2) and screws (4)
c Bag of mounting hardware - includes bushings (8) and screws
(8)
Tools and supplies needed
You will need the following tools and supplies to install the contents of
this kit:
• Phillips (cross-head) screwdriver (#2 bit)
• Antistatic wrist strap (recommended)
Note: The Altos G900 chassis is designed to be compatible with
the EIA-310-d rack standard. Be sure to select a rack cabinet
enclosure that is EIA-310-d compliant.
Equipment rack precautions
Warnings
ANCHOR THE EQUIPMENT RACK: The equipment rack must be
anchored to an unmovable support to prevent it from falling over
when one or more servers are extended in front of it on slide
Figure 57 - Rack-mount kit components
BB!H:11!vh!.!FO/cppl!!Qbhf!257!!Gsjebz-!Kbovbsz!28-!3114!!8;24!QN