Installation Overview
Page 2-3
Installation
Overview
The table below describes the steps needed to install the
IntraSwitch 5324. The steps that are optional are labeled
“optional”; the steps that are required are labeled “required.”
The sections that follow explain each step in detail.
To install the IntraSwitch 5324:
Table 2-1 Installation Overview
Step Action
1 (required) Open the box and check the contents.
See “Package Contents” on page 1-7 for a
complete list of the items included with your
IntraSwitch 5324.
2 (required)
Check the power connection.
See “Connecting Power” on page 2-4.
3 (required)
Install the IntraSwitch in an equipment rack or
prepare it for desktop placement.
See “Rack Mounting/Desktop Placement” on
page 2-5.
4 (required)
Connect the IntraStack to the network.
See “Connecting to the Network” on page 2-7.
5 (optional)
Configure the IntraStack for management
capabilities.
See “Setting up for Management” on page 2-10.
6 (optional)
Install MII module(s), if any.
See “Installing MII Modules” on page 2-13.