Fujitsu B120 Server User Manual


 
Operation controls Preparation for use and operation
A26361-K646-Z102-1-7619 25
4.2 Operation controls
6
4
7
5
2
1
3
8
9
7
4
65
21 3
9
8
1 = Floppy disk drive with power-on indicator
2 = CD-ROM drive with power-on indicator
3 = Lock
4 = Chipcard reader with power-on indicator
(optional)
5 = IDE busy indicator
6 = Message indicator
7 = ON/OFF switch with power-on indicator
8 = Hard disk indicator (optional)
9 = Hard disk error indicator (optional)