Preparation for use and operation Operation controls
26 A26361-K646-Z102-1-7619
4.2.1 Operation controls
Lock
unlocks or locks the server.
ON/OFF switch
switches the server to ready-to-operate or on.
i
The ON/OFF switch and the main switch do not disconnect the server from the line
voltage. To disconnect the line voltage completely, remove the power plug from the
socket.
4.2.2 Indicators
Power-on indicator
lights green when the server is switched on.
IDE busy indicator
lights green when an IDE drive is being accessed.
4.2.3 Drive indicators
Hard disk indicator
Lights when the hard disk drive in this slot is being accessed.
Hard disk error (only in conjunction with disk array controller)
lights, when the hard disk drive in this slot is defective and needs replacing. It is possible, that
the drive is not correctly inserted.
flashes when a rebuild is carried out by the disk array controller after a drive has been
exchanged.
CD-ROM drive indicator
The indicator lights up when the CD-ROM drive is accessed.
Floppy disk drive indicator
The indicator lights up when the floppy disk drive is being accessed.