Gateway 9315 Network Router User Manual


 
64
www.gateway.com
Filling empty drive bays
Empty drive bays in the server must be filled by filler panels, empty drive carriers, or empty
drive trays, as appropriate. With the bezel removed, install the appropriate carrier or filler
panel, then replace the bezel by snapping it into place on the front of the server.