1
14 Series 90 -70 I/O Link Interface Module User’s Manual – February 1993
GFK-0644A
Getting Started
To install and configure a Series 90–70 I/O Link Interface Module, follow these basic
steps:
1. Install the module and complete the I/O Link
Follow the instructions in chapter 2 to install the Series 90–70 I/O Link Module.
After installing the other devices on the link (as instructed in their individual User’s
Manuals), complete the I/O Link cabling. This is also described in chapter 2.
2. Add the I/O Link Module to the Series 90–70 PLC Configuration
Follow the instructions in chapter 3 to complete the Logicmaster 90 configuration
screen for an I/O Link Interface Module.
3. Select and install an application Program Block from the diskette
Chapter 4 explains how to choose the most appropriate Program Block from an
application diskette, and how to add it to a Program Folder.
4. Complete the program logic for the I/O Link Module
This is also explained in chapter 4.