Matsushita CF-W5LWEZZ1 2 Laptop User Manual


 
46
9.3.2.16. Setting Spacer CU on Antenna Cover
WWAN antenna (MAIN)
Screw
WWAN antenna (SUB)
Cable blind sheet
Screw
Screw
Screw
Screw
The coaxial cable connector is processed
in the corner hole of the substrate
Paper tape
Cable fixed sheet
Clamp
Clamp
The cable is fixed
with the paper tape
Corner hole externals standard
This is clamped on the right side
This is clamped on the right side
This is clamped
This is clamped
in the upper part
in the upper part
Clamp
This is clamped on the right side
This is clamped
in the upper part
After the cable is processed to the ditch of rear,
cable fixed sheet is affixed
NEXT
Wall application affixation
Safety work
The oreder of tighting screw:
Antenna cover
Spacer CU
Spacer CU
Spacer CU
Spacer CU is put on the boss before antenna cover is installed.