Matsushita CF-W5LWEZZ1 2 Laptop User Manual


 
71
9.3.5.5. Putting Tape and Sheet
FFC bend part
edge standard
B oth sided tape
Processing
between bosses
The part where conduction
cloth comes in succession
is firmly suppressed.
The position of a red line
puts out the position with
a treatment device.
Conduction cloth
Antenna board R
Antenna board R
Antenna board R
Processing in the vicinity
of Bottom difference root
Screw
Screw
Screw
Screw
Screw
Screw
Conduction cloth is processed
straight next to the boss.
Boss central standard
Refer to the affixation
specification to Figure 2
The coaxial cable is processed
between the battery and the boss.
Convex side
Fixation after processing
not put on convex side of
bottom is done
Figure 2
Figure 1
Boss central
standard
Refer to
Figure 1
Slack is processed
under the tape.
A both sided tape is fixed while installed in the
FFC positional putting out treatment device.
Fixes while installed in the
FFC positional putting out
treatment device.
A remaining amount
is inserted under the
substrate.
A remaining amount is inserted
under the substrate.
Do not process the cable under
MIC,H/P jack.
Installation placed
between bottom case
Fixes with the tape after
the cable is processed below.
(Securing of drive and clearance)
Affixation matched to plinth
externals (left chart red line)
A curved surface side is affixed
to bottom case.
(Contact prevention
with drive spacer)
Safety work
RJ cable sheet
Modem connector installation
USB board installation
Inserts in positioning pin.
Inserts in positioning Pin.
The cable is drawn
out straight.
Bottom corner
standard
Putting
USB cable
spacer
Processing of pin to inside
Modem cable : Under
USB cable : Upper
Processing of pin
to inside
Modem cable : Under
USB cable : Upper
Cable positional accuracy is put
out about this size with a cable
positioning treatment device.
Modem cable is prevented
from running aground to the boss.
Processing which passes side of connector
Slack is lost by processing the cable in the
direction of the arrow when slackening.
Safety work
Safety work
Safety work
Processing of boss
to inside
The cable must not
run aground on the boss.
Safety work
The PET tape wrapping part
of modem cable is processed
to the part HDD FPC.