Matsushita CF-W5LWEZZ1 2 Laptop User Manual


 
75
Hook is hooked
When g is tightened, part is suppressed and tightened.
Screw
(DXQT26+D8FCL)
Screw (DXQT2+E6FCL)
Screw
(DXQT2+E6FNL)
Screw
(DXQT2+E6FNL)
Screw (DFHE5025XA)
Cable does not run
aground on pin.
Safety Work
Safety Work Safety Work
Connection
Processes it
under the pin.
Cable does not
run aground.
Screw
(DXQT2+E6FNL)
The order of tightening screw : a J
Screw
(DXQT26+D8FCL)
Top case
Safety Work
Safety Work
Safety Work
Safety Work
Does not run
aground in the
LAN connector.
Neither WAN cable nor LAN
cable come in succession.
Does not run
aground in the rib.
Does not run aground
in the bottom rib.
Safety Work
Safety Work
The tool is inserted between
the bottom cases with cable.
Tool insertion chart
Does not run
aground in
the rib.
Does not run
aground in the
LAN connector.
Top Case
engagement
The connector
is connected.
The connector
is connected.
After connects the connector, and hinge
department Wiring is confirmed, top case is
installed in the bottom case.
It is confirmed that FFC is processed
straight when top case engages.
9.3.6.5. Assembly of the Top Case