Matsushita CF-W5LWEZZ1 2 Laptop User Manual


 
72
RJ cable sheet
Do not run
aground
to the pin.
Do not run
aground
to the pin.
Do not run
aground
to the pin.
Do not run
aground
to the pin.
Do not run
aground
to the pin.
Do not run
aground
to LAN co-
nnector
Neither WAN cable nor LAN
cable must come in succession.
A remaining amount is
affixed on an opposite side.
The cable is rolled and
a two sided tape is put.
Be sure to bond a two sided tape picking
the board and the cable when you fix the tape.
fixes with the tape by processing
the cable internally.
LAN cable in the pin is processed.
Do not run aground to the pin.
The flaking off paper of sheet is
peeled off, sheet is put on bottom
and the cable is fixed.
The cable is processed
to the cutting lack part.
Connector
connection
Refer to the putting
specification of the
tape to figure A.
Processing of board
to the under
LAN cable is processed
in the pin.
figure A
Processing of pin
to the under
Do not run aground
to the pin.
LAN cable in the pin is processed.
Do not run aground to the pin.
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work
Safety work