Cable installation 28
Model 2616RC T-DAC User Manual 2 • Hardware installation
Installing the WAN cable to a punch-down block
Materials required:
• punch-down tool
• Plastic tie wraps
• WAN cable pin-out specification
Procedure:
1. Measure the distance between SCSI cable entry point on the punch-down block frame and the farthest
port to be wired on the punch-down block (see
figure 14).
Figure 14. Punch-down block wiring
2. Strip SCSI cable insulation and shielding based on the measurement made in step 1.
—
33
67
NOT USED —
34
68
NOT USED
Table 5. WAN cable’s 68 non-terminated twisted-pairs (Continued)
Port/Directio
n
Pairs
68 Pin
Positions
Wire Color
Code
Port/Directio
n
Pairs
68 Pin
Positions
Wire Color
Code