Completing the Installation Checklist
The final step in installing the UPS system is completing the following Installation
Checklist. This checklist ensures that all hardware, cables, and other equipment
have been completely installed . Completing all items on the checklist will ensure a
smooth installation. Make a copy of the Installation Checklist before filling it out,
and retain the original.
After the installation is complete, a service representative will be able to verify the
operation of the UPS system and commission it to support the critical load. The
service representative cannot perform any installation tasks other than verifying
software and operating setup parameters. Service personnel may request a copy
of the completed Installation Checklist to be sure you have completed all
applicable equipment installation.
NOTE: The Installation Checklist MUST be completed prior to starting the UPS
system for the first time.