( 41 / 76 )
(4) Connecting to a 100-pin 0.65-mm-pitch Foot Pattern (Part 3)
Figure 3.14 shows how to connect the emulation probe to a 100-pin 0.65-mm-pitch foot pattern on
the target system with the M3T-FLX-100NRB (not included), and here following is its procedure.
For details on the M3T-100LCC-DMS and M3T-FLX-100NRB, refer to each user's manual.
(1) Attach the M3T-FLX-100NRB to the target system.
For details on how to attach the M3T-FLX-100NRB to the target system, see the user's manual
of the M3T-FLX-100NRB.
(2) Attach the M3T-100LCC-DMS to the M3T-FLX-100NRB.
(3) Attach the M30800T-PTC to the M30850T-EPB.
(4) Attach the M30800T-PTC to the M3T-100LCC-DMS.
Figure 3.14 Connecting to a 100-pin 0.65-mm-pitch foot pattern (3/3)
CAUTION
Notes on Connecting the Target System:
• Take care not to attach the converter board in a wrong direction. It may cause a fatal
damage to the emulator.
•The small connectors of the M3T-100LCC-DMS and M3T-FLX-100NRB are
guaranteed for only 20 insertion/removal iterations.
• The small connectors of the M30800T-PTC are guaranteed for only 50 insertion/
removal iterations.
The HQPACK100RB cannot be used.
Please use the HQPACK100RB168.