x Sun StorageTek 2500 Series Array Hardware Installation Guide • March 2007
FIGURE 2-6 Inserting the Cabinet Rail Adapter Plate on the Cabinet Rail 32
FIGURE 2-7 Adapter plate in place on the Cabinet Rail. 33
FIGURE 2-8 Slide the flange of the rail behind the cabinet rail and between that and the hook of the rail
adapter plat.e, as shown. 34
FIGURE 2-9 Securing the Rail to the Front left of the Cabinet 35
FIGURE 2-10 Adjusting the Length of the Rail at the Back of the Cabinet 36
FIGURE 2-11 Securing the Rail to the Back of the Cabinet 37
FIGURE 2-12 Positioning the Tray in the Cabinet 38
FIGURE 2-13 Array Controller Tray Installed 39
FIGURE 2-14 Rail clip and rear mounting hole on rear of array tray. 40
FIGURE 2-15 Securing the Tray to the Front of a Sun Rack 900/1000 Cabinet 41
FIGURE 2-16 Expansion Ports on the Controller Tray 42
FIGURE 2-17 Expansion Ports on an Expansion Tray 43
FIGURE 2-18 1x2 Array Configuration Cabling Example 45
FIGURE 2-19 1x3 Array Configuration Cabling 46
FIGURE 3-1 Ethernet Ports for Controller A and Controller B 50
FIGURE 3-2 Direct connection from a single data host server 53
FIGURE 3-3 Direct Connection from two data host servers 53
FIGURE 3-4 Data host connection through a Fibre Channel switch 53
FIGURE 3-5 Mixed topology of data hosts connected directly and through FC switches 54
FIGURE 3-6 Connecting the SFP and Fiber-optic Cable to a 2540 Controller 55
FIGURE 3-7 FC host connectors on the 2540 controller. 55
FIGURE 3-8 Direct Connection From a Single Host With Dual HBAs 56
FIGURE 3-9 Direct connections from two data hosts with dual HBAs. 57
FIGURE 3-10 Direct connections from three data hosts with dual HBAs. 57
FIGURE 3-11 SAS Data Host Ports (on back of tray). 58
FIGURE 4-1 Tray Power Connectors and Switches 62
FIGURE B-1 Power Fan Assembly Locations. 92
FIGURE B-2 DC Power Connector Cable and Source Wires 92
FIGURE B-3 DC Power Module LEDs, Power Switch, and Power Cable Receptacle. 93