AEG 6000BP Power Supply User Manual


 
21
4.1 UNPACK AND CHECK
The device has been extensively tested and checked. Although packaging and
shipping has been carefully carried out, damage in transit cannot be totally ruled
out.
Any transport damage claims must be made directly to the shipping company!
Upon receipt, check the contents of the transport containers for any damage. If
necessary, ask the shipping company to check the goods and make a note of any
damages while an employee of the shipping company is still present and report
the damage within eight days of receipt to an AEG representative or retailer.
Check the contents for completeness:
After opening, the top level of the carton contains:
4. INSTALLATION
Fig. 2: Extract – stage 1
• Rack rail kit
• Mounting brackets
• 3 cable glands
• Power cord
• 2 communication cables
(RS232 and USB)
• “CompuWatch” management
software on CD
• Safety precautions & Operating
instructions
• Product registration card
Handle components with care paying particular attention to the weight.
Two people may be required to move the battery units.