APC G35T10KF1B2S Power Supply User Manual


 
Model Width: 523 mm (20.59 in)
Connect Floor Anchoring Brackets to the UPS and XR Battery
Enclosure for Stability
Note: Floor anchoring bolts are not provided with the UPS. Purchase the bolts locally
(minimum size: M8). Follow the specications given by the manufacturer of the oor
anchoring system when bolting the UPS system to the oor.
1. Install the L-shaped oor anchoring brackets
(reuse the two transport brackets) and secure
with the M6 screws and nuts (provided).
2. Drill two to six holes in the oor for each
bracket and attach these with bolts.
990-1957C-001
MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation
11