Install Seismic Option
Install the Seismic Battery Lock
Note: In seismic areas, dispose of the battery securing brackets that were used to secure the
batteries during transport and use the seismic battery locks to secure the batteries.
Required parts:
• Four battery locks and 12 M5 screws for narrow
battery enclosures.
• Six battery locks and 30 M5 screws for wide
battery enclosures.
1. Place the battery lock below the battery row.
2. Secure the battery lock by the provided M5
screws.
Install the Seismic Stabilizing Brackets
Required parts:
• UPS, Battery Enclosure and Transformer
– Eight 10 mm ttings
– 18 M6 nut washers
– One horizontal bracket
– Four stabilizing brackets
• Maintenance Bypass Panel (MBP)
– Eight 2 mm ttings
– 18 M6 nut washers
– One horizontal bracket
– Four stabilizing brackets
42
MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation
990-1957C-001