APC G35T10KF1B2S Power Supply User Manual


 
Install the Baying Kit (Optional) for Interconnection of Enclosures and
Seismic Anchoring
Caution: Baying kits are required in seismic areas.
1. Remove the side panels from the enclosure(s) to get access to the holes in the bottom frame.
UPS UPS
Note: Make sure that the enclosures are level so that they can be anchored to each other.
2. Position two U-shaped oor anchoring brackets under one enclosure; one on each side.
2
2
Note: The U-shaped anchoring brackets are 1-2 mm higher than the opening below the
enclosure to inactivate the casters. Therefore, the enclosure must be tilted when placing the
U-shaped anchoring brackets under the enclosure.
990-1957C-001
MGE™ Galaxy™ 3500 10-30 kVA 208/220 V Single and Parallel Installation
13