DRAFT
2
Installation
This chapter explains how to install the IntraSwitch 5308FL in
an equipment rack, power it on, and connect it to your
network.
It also explains how to configure the IntraSwitch 5308FL for
management capabilities and install an MII expansion module.
This chapter contains the following sections:
❏ Installation Guidelines — page 2-2
❏ Installation Overview — page 2-3
❏ Rack Mounting/Desktop Placement —
page 2-4
❏ Installing MII Modules — page 2-6
❏ Connecting Power — page 2-8
❏ Connecting to the Network — page 2-9
❏ Setting up for Management — page 2-12