Cisco Systems 2948G-GE-TX Switch User Manual


 
4-7
Catalyst 2984G, 2948G-GE-TX, and 2980G Switch Hardware Installation Guide
78-6286-05
Chapter 4 Configuring the Gigabit Ethernet Ports
Installing, Removing, and Maintaining GBICs
To install a GBIC, perform these steps:
Step 1 Remove the GBIC from its protective packaging.
Step 2 Verify that the GBIC is the correct type for your network by checking the part
number.
The part number indicates whether it is 1000BASE-SX, 1000BASE-LX/LH, or
1000BASE-ZX.
Step 3 Grip the sides of the GBIC with your thumb and forefinger; insert the GBIC into
the slot on the front of the module.
See Figure 4-2 for GBIC installation on a Catalyst 2948G switch. See Figure 4-3
for GBIC installation on a Catalyst 2980G switch.
Note GBICs are keyed to prevent incorrect slot insertion. See Figure 4-4.
Figure 4-2 Installing a GBIC on a Catalyst 2948G Switch
CONSOLE
1000Base - X
10BaseT
S
T
A
T
U
S
C
a
t
a
ly
s
t
2
9
4
8
G
98456
Plug GBIC