Cisco Systems 611 Network Hardware User Manual


 
Chapter 3 Installing the Cisco Wide Area Application Engine
Tools and Parts Required
3-2
Cisco Wide Area Application Engine 511 and 611 Hardware Installation Guide
OL-7220-02
Tools and Parts Required
A sliding rail rack-mount kit and cable management assembly is included in your
shipping container accessory box. The rack-mount kit is suitable for mounting the
device in a 19-inch (48.26-cm) four-post equipment rack.
Angle brackets for mounting the device in a two-post rack are also included in
your shipping container.
You need the following parts and tools to install the device in a rack:
Flat-blade screwdriver
Phillips screwdriver
One rack-mount kit
Documentation
Installing the Cisco Wide Area Application Engine
Place the device in the desired location. You can mount it in a rack for your
convenience, or place it on a solid, stable surface. If you do not plan to install the
unit in an equipment rack, proceed to the “Installing the Chassis on a Tabletop”
section on page 3-12.
Racks are marked in vertical increments of 1.75 inches (4.44 cm). Each increment
is referred to as a rack unit (RU). A 1-RU device is 1.75 inches (4.44 cm) tall.