Cisco Systems SCE 2000 4xGBE Network Card User Manual


 
Contents
Cisco SCE 2000 4xGBE Installation and Configuration Guide
ii OL-7824-04
Back Panel 2-4
Checking the Shipping Container Contents 2-5
SCE 2000 Component List 2-6
SCE 2000 Installation Checklist 2-7
Topology 3-1
The SCE 2000 Platform 3-1
Topology Considerations 3-1
Functionality 3-2
Number of links 3-2
Redundancy 3-2
Link Continuity 3-3
Physical Topologies 3-4
Single SCE 2000 Topologies 3-4
Two Cascaded SCE 2000s For Dual Links 3-8
Topology-Related Parameters 3-9
Installation and Maintenance 4-1
Preparing to Install the SCE 2000 Platform 4-1
Tools and Parts Required 4-2
Site Requirement Guidelines 4-3
Installing the SCE 2000 Platform 4-4
Installation Precautions 4-5
Installing the SCE 2000 on a Workbench or Tabletop 4-5
Rack-Mounting a SCE 2000 Platform 4-6
Attaching a Chassis Ground Connection 4-10
Power Supply Overview 4-12
LEDs 4-13
Power Supply Specifications 4-14
Removing and Replacing a Power Supply Unit 4-14
Powering Down the Power Supply Unit and Disconnecting Input Power 4-15
Removing the Power Supply Unit 4-16
Replacing the Power Supply Unit 4-17
Reconnecting the Power 4-17
Fan Module Overview 4-20