Cisco Systems SCE 2000 4xGBE Network Card User Manual


 
Chapter 6 Cabling the Line Ports and Completing the Installation
Connecting the line ports to the network
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-04 6-5
Dual Link: Two SCE 2000s Topology
In this topology, two SCE 2000s are connected to two full duplex, GBE links, providing full
redundancy through cascading the two SCE 2000s. The SCE 2000s may be either inline, to
support both monitoring and traffic control functionality, or receive-only for traffic monitoring
functionality only.
Note
When installing a cascaded system, it is extremely important to follow the sequence of procedures
outlined in the section Installing a Cascaded System (on page 6-10).
Note
Receive-only topologies can be implemented using either an optical splitter or a switch. If a switch is
used, it must support SPAN functionality that includes separation between ingress and egress traffic and
multiple SPAN-ports destinations.
When two SCE 2000s are used, the first two ports in each SCE 2000 are connected to the links,
while ports 3 and 4 are the cascade ports that are used for communicating between the two SCE
2000s as follows:
SCE
2000
#1
Port 1: Link 1, Subscribers side
Port 2: Link 1, Network side
Port 3: Cascade, connect to Port 4 in SCE 2000 #2
Port 4: Cascade, connect to Port 3 in SCE 2000 #2
SCE
2000
#2
Port 1: Link 2, Subscribers side
Port 2: Link 2, Network side
Port 3: Cascade, connect to Port 4 in SCE 2000 #1
Port 4: Cascade, connect to Port 3 in SCE 2000 #1