21
5. Slide the paper supports (4) outward as far as they will go. Lift the
hammer bank protective foam (5) and remove it from between the
ribbon mask and the platen.
6. Remove the foam strips (6) and the tape securing the foam strips.
7. Rotate the forms thickness lever (7) downward to position “A”.
6
5
4
7