Gateway 960 Server User Manual


 
69
Installing a voltage regulator
www.gateway.com
Installing a voltage regulator
To install a voltage regulator:
1 Follow the instructions in “Preventing static electricity discharge” on
page 41.
2 Follow the instructions in “Opening the server case” on page 42.
3 If you are installing a new voltage regulator, go to Step 5.
- OR -
If you are replacing a voltage regulator, on each end of the voltage regulator
support bracket, pinch the sides together, then lift the bracket away from
the server. You may need to first remove a heat sink or some memory
modules in order to access the sides of the support bracket.
4 Lift the voltage regulator away from the system board.
5 Insert the new voltage regulator into the voltage regulator slot, then replace
the support bracket.
6 If you removed a heat sink or some memory modules in Step 3, replace
them.
7 Follow the instructions in “Closing the server case” on page 45.