Gateway E-9425R Server User Manual


 
www.gateway.com
47
4 Remove the power distribution board cover (1) by pulling it out of the chassis.
5 Disconnect the main power, CPU power, backplane power, I
2
C power, and midplane power
cables. See “System board” on page 4 for the location of the connectors on the system board.
6 Remove the screw (2) holding the power board into the chassis, then press down the tab
(3) and move the power distribution board away from the side of the chassis (4) to disengage
the locking tabs and lift it out of the chassis (5).
7 Align the new power distribution board with the stand-off and locking tabs on the chassis,
then place it on the stand-offs and slide it toward the side of the chassis until the tab clicks
into place.
8 Replace the screw you previously removed.
9 Reconnect the power cables. See “System board” on page 4 for the location of the connectors
on the system board.
10 Reinstall the power supply modules by following the instructions in “Replacing a power
supply module” on page 45.
11 Follow the instructions in “Closing the server case” on page 30.
Replacing the power cage
To replace the power cage:
1 Follow the instructions in “Preventing static electricity discharge” on page 28. Make sure that
you turn off the server, then unplug the power cord(s) and all other cables connected to the
server.
2 Follow the instructions in “Opening the server case” on page 29.
3 Remove the power supply modules by following the instructions in “Replacing a power
supply module” on page 45.
4 Remove the power distribution board by following the instructions in “Replacing the
hot-swap backplanes” on page 48.