3Com 6200 Switch User Manual


 
2-4 3COM Security Switch 6200 Hardware and Software Users Guide
Installation
Additional
Equipment
PC running RedHat Linux 6.2 or greater software. This software is
used to support the Security Switch 6200 Graphical User Interface
(GUI) and for hosting the Check Point™ FireWall-1
®
Management
Server.
PC running WinNT4/Win2K software. This software is used for
launching the Check Point FireWall-1 GUI and the system’s embedded
WEB GUI.
Security applications licenses to activate installed software on
the system.
Required
Equipment
To install the chassis in a standard rack you need certain hand tools,
appropriate cabling, and additional hardware not included in the
chassis shipment.
Tools
To install the chassis into a standard rack you need, as a minimum, a
Phillips screwdriver (9” minimum, #2).
Cables
Cabling requirements are installation-specific. Prior to installation you
should know:
The kind and number of cables required for each type of interface.
The distance limitations for each signal type. Table 2-1: provides the
approximate cable distance limitations.
Table 2-1: Cable Distance Limitations
Table 2-2: shows the cables that ship with chassis.
Table 2-2: System Cables
Cable Description Distance Limitation
Craft port: RS-232 DB9 directly
from the system
15 meters maximum
(50 feet maximum)
Management Link port: 10/100 Cat 5 cable, 100 meters (328 feet)
Copper Ethernet Link Port: 10/100/
1000
Cat 5 cable, 100 meters (328 feet)
Fiber Ethernet Link Port: Gigabit 62.5 micro-fiber - 275 meters
(902 feet)
50 micro-fiber - 550 meters
(1805 feet)
Cable Description
Power Cabling Standard AC power cable.
Console Port Serial shielded straight-through 9-pin D-sub female to 9-
pin male cable.