PDU Display Interface
26 80kW InfraStruXure PDU—Operation and Configuration
Panel Configuration
Configure the branch metering settings for each breaker on the
distribution panel. The panel position numbers on the screen
correspond to the numbers on the distribution panel. (Odd
numbers are on the left; even numbers are on the right.) Once you
have selected the correct range, configure the settings for each breaker in the range:
Pos: The panel positions in the selected range.
Breaker: Two configurable items:
The breaker rating, in amps.
The breaker tie indicator—define the number of panel positions tied (i.e., associated). You can
associate positions with breakers, which enables you to view status about each breaker and
receive alarm notification when any of a breaker’s poles are above or below the configured
branch circuit limit. You can also tie together panel positions that are logically associated. For
example, you can tie together panel positions for three separate breakers that are connected to
the same PDU power cord and that feed power to the same equipment enclosure.
To configure the values on this screen:
1. From the first column, use the arrow keys to scroll up or down to the pole position you want to
configure.
2. Press the
ENTER key to move to the item you want to configure in the third column (the breaker
rating or the breaker tie indicator).
3. Scroll again to select the value you want for the breaker rating or the breaker tie indicator. To
associate one panel position with the next position in the list, choose the + character as the tie
indicator immediately following the breaker rating. To indicate that the position is not tied to
(associated with) the next panel position in the list, choose the
] character as the tie indicator
immediately following the breaker rating. When you change the
+ or ] character that follows the
breaker rating in one row, the
+ or [ character before the breaker rating in the next row also
changes to indicate the changed association between the panel positions.
For example, this screen shows three, single-pole, 20A, tied
breakers occupying positions 08, 10, and 12 on the top right
distribution panel.
Panel Configuration
Select Range:
[01..41] [02..42]
Pos
08
10
12
Breaker
[ 20A +
+ 20A +
+ 20A ]
Note
Circuit breakers with ratings above 60A are considered sub-feeds. To configure a
subfeed circuit breaker, select a value above 60A. The interface will display “SUB”
after the rating you have selected. Only the bottom 12 positions on the distribution