American Power Conversion PD80KF6FK1-M Power Supply User Manual


 
80kW InfraStruXure PDU—Operation and Configuration 39
How to Apply Power to the System
This procedure instructs on how to apply power to a system that has already been installed. For initial
start-up instructions, see the InfraStruXure 80kW Installation and Start-Up manual.
1. Set the upstream utility, and, if applicable, the
bypass input and utility circuit breaker to ON.
1. Set the Main Input (A) switch on the
PDU to ON.
2. Set the Q1 circuit breaker on the
PDU to ON to apply power to the UPS.
3. If applicable, set the Q10 Bypass
Input (B) switch on the PDU to ON.
A
B