American Power Conversion PD80KF6FK1-M Power Supply User Manual


 
System Operation
42 80kW InfraStruXure PDU—Operation and Configuration
9. To apply power to the PDU distribution panel,
close (turn ON) the Q2 circuit breaker on the PDU.
10. To apply power to the PDU power cords and
connected equipment, close (turn ON) the
distribution panel breakers.
11. If applicable, close (turn ON) the Cross Tie
Output or MCCB Subfeed (X) circuit breaker.