Belkin F1DE208C Switch User Manual


 
4140
USING YOUR SWITCH
Completing the Firmware Update
The Switch needs to be power-cycled (or reset) after a successful download, so that
it can program its internal components. The update process will not be complete
until the device has been power-cycled.
Warning! If the update process failed or was disrupted, DO NOT power-cycle the
device! Resetting the device at this point may cause the Switch to be programmed
with corrupted data. This may cause your Switch to stop working and become
incapable of accepting corrective updates. Try updating the device again; if this
fails, then contact Belkin Technical Support for assistance.
Completing a Standalone KVM Firmware Update
1. Power-cycle or reset the Switch.
2. The internal components of the Switch will be reprogrammed with the new code
(This may take several minutes). During the programming process, the
direct-access port selector LEDs will blink on and off and the 7-segment LEDs will
display a series of diagnostic codes.
3. When the update is complete, the Switch will play a series of tones, boot
automatically, and display the Splash Screen. The Switch is now updated and
fully functional.
Completing a Firmware Update on Multiple KVM Switches (Daisy-Chained)
1. Power-off ALL of the Switches in the daisy-chain.
2. Power-on ONE Switch.
3. The internal components of the Switch will be reprogrammed with the new code
(This may take a few minutes). During the programming process the direct-access
port selector LEDs will blink on and off and the 7-segment LEDs will display a
series of diagnostic codes.
4. When the update is complete (approximately 2 minutes), the Switch will play a
series of tones, boot automatically, and display the Splash Screen. The Switch is
now updated and fully functional.
5. POWER-OFF the updated Switch.
6. Repeat steps 2–5 for each of the Switches until all have been successfully updated.
7. When all of the Switches have been independently updated, power-on all of the
BANKs of the daisy-chain. The entire daisy-chain is now updated and fully functional
USING YOUR SWITCH
When the update is complete, the Next button will become active, allowing the user
to complete the update.
If the download fails for any reason, a dialog box will appear with an option to retry
the update.
If the application has completed successfully, this screen will be displayed. If a
reboot is required, that will be indicated on this screen. When you click “Finish”, the
AutoUpdate application will close.
When the AutoUpdate is complete, the 7-segment LED will display “PC”, indicating
that a power cycle is needed to complete the update.
P74290ea_F1DExxxC_man.qxd 30-10-2003 11:20 Page 40