Installation Instructions IM581127000
Spec. No. 581127000 (Model 710NPBA) Issue AB, March 22, 2012
Chapter 2. Installing the System Page 19
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Installing an Optional Bullet Nose Type
6-Position GMT Distribution Fuse Block
Note: Refer to Figure 2-11 as this procedure is performed.
Procedure
1) Open the distribution cabinet’s front door by turning the latch in the
counterclockwise position.
2) Follow the steps in Figure 2-11.
3) Install an appropriately sized GMT fuse in each fuse mounting position on the
GMT Distribution Fuse Block as required. If dummy fuses are installed, first
remove the dummy fuse.
a) Verify that dummy fuses are installed in all unused fuse positions on the
GMT distribution fuse block.
b) Verify that a plastic safety cover is installed on all GMT fuses on the GMT
distribution fuse block.
4) Record all fuse sizes (installed on the GMT distribution fuse block) on the label
provided on the shield.
5) Close the distribution cabinet's front door. Turn the latch clockwise to secure the
door.