Emerson 710NPBA Power Supply User Manual


 
IM581127000 Installation Instructions
Issue AB, March 22, 2012 Spec. No. 581127000 (Model 710NPBA)
Page 22 Chapter 2. Installing the System
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Installing TPL-B Fuses
Refer to the following procedure and install appropriately sized TPL-B fuses into the
proper fuseholders in the distribution cabinet.
Procedure
Note: Refer to Figure 2-13 as this procedure is performed.
1) Open the distribution cabinet’s front door by turning the latch in the
counterclockwise position.
2) Remove the fuse case from the mounted fuse block by grasping its handle and
pulling it straight out.
3) Verify that an 18/100 ampere alarm fuse is present in the GMT-type fuseholder
located on the fuse block and that a plastic safety cover is installed on this fuse.
4) Open the fuse case.
5) Install the TPL fuse into the fuse case.
6) Close the fuse case.
7) Firmly plug the fuse and fuse case into the fuse block.
8) Record all fuse sizes on the cards provided within the fuseholders.
9) Close the distribution cabinet's front door. Turn the latch clockwise to secure the
door.
Figure 2-13
Installing TPL-B Fuses
Fuse Case
Open Fuse Case View
TPL Fuse
Fuse Installed in
Open Fuse Case
(rear view)
Fuse Installed in
Closed Fuse Case
(rear view)
Fuseblock
(P/N 516241)
GMT-18/100AAlarm Fuse
(P/N 248610301) and
GMT-X Safety Fuse Cover
(P/N 248898700)
(Both are provided
w/ fuseblock)