INITIALLY STARTING, CONFIGURING,
AND CHECKING SYSTEM OPERATION
Important Safety Instructions
Caution: Performing various steps in the following procedures may cause a
service interruption and/or result in the extension of alarms. Notify any
appropriate personnel before starting these procedures. Also, notify
personnel when these procedures are completed.
Initial Startup Preparation
Ensure that all blocks for Chapters 2 through 4 in the Installation Acceptance
Checklist, located in Chapter 1, have been checked.
Ensure that module mounting positions are filled by a rectifier module, DC-DC
converter module, or a blank cover panel as desired. It is acceptable for positions to
be left vacant.
Refer to the configuration drawing (C-drawing) supplied with your power system
documentation for factory settings of adjustable parameters.
Initially Starting the System
Procedure
1) Apply DC input power to the system by closing the external DC disconnect(s) or
protective device(s) that supplies battery power to the system, if furnished. Close
the system’s internal battery disconnect circuit breakers, if furnished.
2) Apply AC input power to the system by closing ALL external AC disconnects or
protective devices that supply AC power to the module mounting shelves.
Rectifiers and converters (if furnished) automatically start.
3) Open the distribution cabinet’s front door by turning the latch in the
counterclockwise position.
4) Place each distribution circuit breaker (if furnished) to the ON position.