IM581127000 Installation Instructions
Issue AB, March 22, 2012 Spec. No. 581127000 (Model 710NPBA)
Page 76 Chapter 4. Making Electrical Connections
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
List BE: Battery Disconnect Distribution Panel,
(2) TPH Fuse Battery Disconnect Position (without Shunts)
(without Return Busbar)
List BF: Battery Disconnect Distribution Panel,
(2) TPH Fuse Battery Disconnect Positions (with Shunts)
(without Return Busbar)
+24VDC Battery
Connections
BATTERY CONNECTIONS
3/8-16 Captive Nuts on 1” Centers Maximum Lug Width: 1.88 inches.
(Customer must supply
or order additional
hardware)
Observe proper polarity
when making battery
connections.
WARNING!
For an 800A circuit breaker,
load must not exceed 600A.
+24VDC Battery
Connections
BATTERY CONNECTIONS
3/8-16 Captive Nuts on 1” Centers Maximum Lug Width: 1.88 inches.
(Customer must supply
or order additional
hardware)
Observe proper polarity
when making battery
connections.
WARNING!
For an 800A circuit breaker,
load must not exceed 600A.