Emerson 710NPBA Power Supply User Manual


 
IM581127000 Installation Instructions
Issue AB, March 22, 2012 Spec. No. 581127000 (Model 710NPBA)
Page 108 Chapter 5. Installing the Modules and Initially Starting the System
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Final Steps
1) If any ACU+ Controller configuration settings were changed, refer to the ACU+
User Instructions (UM1M820BNA) and save a copy of the configuration file. This
file can be used to restore the ACU+ Controller settings, if required, at a later
date.
Note that provided on a USB drive furnished with the system is an ACU+
configuration drawing (C-drawing) and the ACU+ configuration files loaded
into the ACU+ as shipped.
2) Close the distribution cabinet’s front door. Turn the latch clockwise to secure the
door.
3) Verify all rectifier and converter modules and the ACU+ are fully seated, latched,
and the latch handle screws secured.
4) Verify there are no external alarms and the local indicators are as shown in Table
5-1.