Installing and removing the ROMB battery pack for the
mezzanine RAID card
To remove and install a ROMB battery pack for the mezzanine RAID card:
1 Follow the instructions in “Preventing static electricity discharge” on
page 30. Make sure that you turn off the server, then unplug the power
cord(s) and all other cables connected to the server.
2 Follow the instructions in “Opening the server case” on page 31.
3 Push the release lever (1), then lift the ROMB battery pack for the
mezzanine RAID card (2) out of the chassis.
4 Align the new battery with the battery slot, then push the new battery into
the slot until it clicks into place.
5 Follow the instructions in “Closing the server case” on page 32.
Installing and removing an optional mezzanine board
This server has two types of optional mezzanine boards. They include a
2-channel SAS mezzanine board, and 2-channel SAS mezzanine board with
RAID. They are designed to provide extra HDD storage capability with one
160-pin mezzanine board connector. Each type of mezzanine board uses the
specific chipset for optimal features and provides expansive storage by
connecting with the extra drives.
To install an optional mezzanine board:
1 Follow the instructions in “Preventing static electricity discharge” on
page 30. Make sure that you turn off the server, then unplug the power
cord(s) and all other cables connected to the server.
2 Follow the instructions in “Opening the server case” on page 31.
3 Remove the PCI riser assembly by following the instructions in “Installing
and removing PCI expansion cards” on page 44.