43
WWAN Board
WM Cable
Screw
Screw
Screw
REAR wall application
LCD Hook WAN
LCD Hook Wan installation standard
Connection
REAR wall application
There is no order specification
excluding a specified part.
The oreder of tightening screw (LCD Hook WAN) :
The oreder of tightening screw (WWAN Board) :
9.3.2.16. Assembly of the WWAN Board
Refer to Figure 1
The cable must not stretch.
The cable must not stretch.
The cable must not stretch.
A two sided tape of the cable after the cable position
of Figure 1 is put out is affixed (cable fixation).
A two sided tape of the cable after the cable position
of Figure 1 is put out is affixed (cable fixation)
<Figure 1>
The convex REAR part is set to the cable bundling part
Conductive cloth
Conductive cloth
edge standard
Bundling edge standard 5-8mm
Conductive cloth
must not hang to PET TAPE
about 15mm
about 15mm
about 15mm
Safety work
PET TAPE
Root fixation
9.3.2.17. Putting Tapes for WM Cable