Matsushita CF-T5LWETZ1 2 Personal Computer User Manual


 
48
9.3.3.3. Putting PET tapes
Cable’s root is surely suppressed
Screw A
Screw B
Processes on the capacitor
Processes between capacitors
The order of tightening screw :
Screw : DXQT2+D25FNL
Modem Cable must install MDC MODEM in Main Board after connects with MDC MODEM.
Do the machine screw tightening in Main Board by tightening the hand. Moreover, note that receives by the hand,
and Main Board is not curved on the other side of Main Board of the machine screw tightening part.
Solder crack prevention by Main Board spring
Tape
Affixes between DAI
Processes next to the connector
Connector connection
Processes to the CHIP set
(CHIPSETDAI(Dotted line part)
Thing that running aground is
not in capacitor)
(Attention)
Connector connection
Substrate externals match
POWER SW edge application
Execute after setting the substrate in the receiving treatment device when working.
Do not get on the
machine screw hole
Square hole
Put the Both
Side Tape
USB Cable
Main Board Sheet
PCMCIA-MAIN Sheet