63
Safety work
Safety work
Safety work
Line Hold Sheet
Direction of cable drawing
The edge of the tube of the TP cable
must reached the DC Jack Holder.
The TP cable is fixed by drawing
line processing Sheet in the direction
of the arrow.
The TP cable must not run aground in the boss.
The tape is pasted from the upper
surface of DC Jack Holder to the
side and the TP Cable is fixed.
It is confirmed that the TP Cable is
not a file.
Connector connection
TP cable
The cable passes the route of this line.
Line Hold Sheet A
Safety work
Safety work
Connector connection
Line processing between
connector and CPU DIE.
Pasting applying fixation
The slack of the line is
processed on the left side.
The point of the tube is made to be come
from CPU DIE corner to the connector side.
Relay cable
9.3.6.3. Line processing Relay Cable