Matsushita CF-T5LWETZ1 2 Personal Computer User Manual


 
62
9.3.6. Assembly knowhow of the Body
9.3.6.1. Setting LCD
LCD UNIT
SCREW(a)
DXQT26+D5FNL
SCREW(b)
DXQT26+D5FNL
Conductive Cloth is wrapped.
Safety work
Bottom Case
MAIN PWB
Safety work
Safety work
Safety work
Safety work
Safety work
The final state
Work is executed in order of (1) (2) (3) (4).
60 3mm
Conductive Cloth
TP Cable Fix Sheet
TP Cable Fix Sheet
Affixes to the wall
at bottom by the
rib match.
The seat is rolled to
cover the cable, and
puts on the hinge wall.
A two sided tape is pasted
to the wall according to the
edge of the wall.
After the line is processed,
pushes with the cushion.
Sheet does not run
aground in Screw hole land.
TP Cable
Fix Cushion
Running aground
prevention treatment
device
The cable is passed
between the screw
head and the Bottom Wall.
Do not run aground on the
friction board of the hinge.
(Use the treatment device)
The LCD cable is passed on
the seat at the left of the TP
cable.
4 8mm
(2) Cable processing
to ditch
The cable passes on the DC Jack Holder,
fixes on the side of the LCD signal line.
(3) Cable processing
to DC Jack Holder
(Round parts is pressurized)
Line processing sheet
Cable
VGA connector
Machine screw hole land
The space is secured.
(1) Affixes in the connector
molding part.
(4) The cable processed under
the hanging part on the edge.
(floatage prevention)
rolls in the LCD cable, and
about 8mm at the edge <bot-
tom case sidewall> is affixed.
9.3.6.2. Line processing LCD Cable (bottom case side)