Nortel Networks 1002rp Network Card User Manual


 
October 2006 Preparing for installation
1002rp Server Hardware Installation 43
you are satisfied that the
1002rp server has arrived
at your site undamaged
replace the server cover and
proceed with the hardware
installation.
See “Installation checklist” on page
34.
Note: Do not reinstall the front
bezel until the server is in its final
location and the CallPilot
installation is complete.
IF THEN