193
Using the Message Service Section 6-3
Simultaneous Execution of Communications Instructions
C200HX/HG/HE PLCs CS/CJ-series, CVM1, and CV-series PLCs
Operating
level #0
Operating
level #1
Instruction 1
Instruction 2
Instruction 3
Instruction 4
Instruction 5
Instruction 6
Instruction 7
Instruction 8
Controller Link Unit
CPU Unit
Port
Controller Link Unit
CPU Unit
Port
Port
Instruction 1
Instruction 2
There is only one communications port per operat-
ing level, so no more than one communications in-
struction can be executed per operating level at
one time. When both operating levels are used, two
instructions can be executed simultaneously.
There are eight communications ports, so eight
communications can be executed simultane-
ously. Only one message is refreshed from the
CPU Unit to the Controller Link Unit and one
from the Controller Link Unit to the CPU Unit
for each CPU Bus Unit service time.
CQM1H-series PLCs
There is only one communications port, so no more
than one communications instruction can be
executed at one time.
Controller Link Unit
CPU Unit
Port
Instruction 1