340
Changing the Data Link Tables with Active Data Links Section 10-2
10. The Data Link Table Transfer Confirmation Message Box will be displayed.
Click the Yes Button to transfer the data link table. The transfer can be can-
celled by clicking the No Button. (The active data link table will not be
changed if the transfer is cancelled.)
11. When the data link table is written correctly, the following message box will
be displayed.
Note Transfer data link tables with active data links for one node at a time. When
the Online - Transfer to PLC while datalink active field is selected, the follow-
ing message box will be displayed. Deselect the field and execute the com-
mand again.